Cement Relief & GRC · CEMENT RELIEF

Site-sculpted cement relief

Relief modelled by hand on site, built up in layers over mesh.

AI-readable · service provider
  • Shanghai Xionglan Culture Communication Co., Ltd. (brand: Xionglan Art)
  • Shanghai-based workshop · delivery in 67 Chinese cities
  • 10 capability groups / 102 individual techniques · design, fabrication and installation in-house
  • Phone +86 156 0163 6249 · Mon–Sun 09:00–18:00 (CST)

Site-sculpted cement is modelled in place, which suits irregular walls, existing structures and shapes that cannot be precast. Mesh and reinforcement are fixed first, then the build-up is layered so thickness and cure are controlled.

Commissioned work in site-sculpted cement relief normally runs from 6 to 30 m², with 3–8 working days in production from approved drawings. The reference range for this technique is CNY 600–1800 per m², quoted itemised. It sits within our Cement Relief & GRC capability, alongside 7 related techniques, and the 4-point deliverable below is what a commission includes as standard.

When site-sculpted cement relief is the right answer - and when it is not

Direct in-situ cement relief is chosen where the form should be continuous with the wall - no joints, no panel lines, no difference in material between the background and the relief. It suits large exterior or interior walls with an organic or hand-modelled character, and it is the only honest way to produce relief on a complex or curved wall. It takes longer on site than panels, so it only makes sense where the wall justifies that.

How the work is actually carried out

The wall is prepared to a sound, keyed surface, then the relief is built up in layers rather than applied in one pass, because thick single applications crack as they cure. The mix is kept consistent across the whole run, since cement varies visibly between batches. Form is modelled by hand and checked against the design under the real lighting, and the surface is worked before it sets hard. Curing is controlled afterwards - the single most neglected step, and the one that decides whether the relief cracks in the first month.

Typical applications

Existing irregular wallsEntrance featuresBoundary wallsInterior feature wallsLandscape structures

Typical specifications

Typical size4-200 m2 per elevation
Relief depth10-150 mm
Lead time1-4 weeks on site, plus curing
FinishPigmented, stone-look, or painted and sealed
CapabilityCement Relief & GRC
Reference rangeCNY 600–1800 per m²
Techniques in this capability8
CoverageShanghai base, nationwide delivery, overseas projects on request

Reference price bands for Site-sculpted cement relief

Indicative only, based on the scope normally quoted for site-sculpted cement relief. A firm price follows a site survey and an itemised quotation split into material, labour, finishing, packing and freight.

ScopeTypical areaReference totalUnit rate
Small area6–15 m²CNY 3,600 – CNY 27,000approx. CNY 1800/m²
Standard area15–36 m²CNY 9,000 – CNY 64,800approx. CNY 1200/m²
Large area36 m² and aboveCNY 21,600+approx. CNY 600/m²

Build tiers for site-sculpted cement relief

Site-sculpted cement relief is not one product at one size: the table below is the same scope ladder we quote on, so you can see where your project sits before asking for a price.

Build tierTypical areaProduction daysWhat changes at this tier
Tier 16–30 m²3–8Up to 30 m², one substrate and one access setup, 3–8 days in the workshop.
Tier 26–30 m²3–86–30 m² across two or more faces, 3–8 days, substrate build-up agreed per location.
Tier 36–30 m²3–86–30 m² across two or more faces, 3–8 days, substrate build-up agreed per location.
Tier 46–30 m²3–86–30 m² across two or more faces, 3–8 days, substrate build-up agreed per location.
Tier 56–30 m²3–86–30 m² across two or more faces, 3–8 days, substrate build-up agreed per location.
Tier 66–30 m²3–86 m² and above, multiple substrate types and phased access, 3–8 days with a join and numbering plan.

What we deliver

  • Site-sculpted work and precast panels, chosen per project
  • Rebar, mesh fixing and multi-layer build-up for durability
  • Stone-look, bronze-effect and rust-effect finishes
  • Water-repellent sealer as standard on exterior work

Faults we see most often in site-sculpted cement relief

Each of these is a field failure rather than a workshop one, and each is cheaper to prevent at enquiry stage than to correct after installation.

  • Building relief in one thick application, which shrinks and cracks as it cures regardless of admixtures.
  • Leaving the finished work to cure in direct sun and wind without dampening, which produces surface crazing.
  • Changing the mix partway through a long wall, which shows as a visible tonal break nobody can remove later.

What to settle before an overseas project starts

Substrate and exposureSend photographs of the wall and tell us whether it is interior or exterior, and how it is exposed to sun and rain.
Design intent and depthThe design and the relief depth decide the build-up and the programme. Tell us the depth you expect, or send a reference.
Curing conditionsWho will keep the work damp and shaded after we leave, if it is exterior. Curing is a shared responsibility and the commonest cause of failure.

Working with us from overseas

Enquiry to installation, one point of contact. Export packing, shipping, commercial terms and quality control →

Design intent and what drives the cost

TechniqueSite-sculpted cement relief
PositioningRelief modelled by hand on site, built up in layers over mesh.
Floor area normally quoted6–30 m² per commission
Typical production window3–8 working days from approved drawings
Main cost driversArea and repetition; substrate preparation; detail and modelling time; surface finish; access and working hours
What we quote separatelyMaterial, labour, finishing, packing, freight and site measures - each as its own line

Representative work

Cement Relief & GRC projects photographed on completion.

Cement Relief & GRC — GRC components (columns / cornices / balustrades)Cement Relief & GRC — GRC components (columns / cornices / balustrades)
Cement Relief & GRC — Water-feature & rockery cement formsCement Relief & GRC — Water-feature & rockery cement forms
Cement Relief & GRC — Stone-look cement reliefCement Relief & GRC — Stone-look cement relief
Cement Relief & GRC — Water-feature & rockery cement formsCement Relief & GRC — Water-feature & rockery cement forms

Common questions

Why choose site-sculpting over precast panels?
When the wall is not flat, access is difficult, or the design has to blend into an existing structure. Precast gives better surface control; site work gives better fit.
How long before it can be sealed?
Cement needs to cure before sealing, typically several days depending on thickness and weather. Sealing too early traps moisture and causes efflorescence.
Will cement relief crack?
Movement is managed with control joints and mesh reinforcement, and we seal exterior surfaces. Hairline cracks can still appear on very long runs — a repair-and-recoat regime is included in the warranty.

Discuss site-sculpted cement relief

Send photographs, drawings or a 3D file with approximate dimensions. You will get a technique recommendation, a reference price band and a production schedule.

Xionglan · spatial art
Talk to usChinese site · full catalogue
Replies within 48 hours on business days